Overhead Rate

Understanding Predetermined Overhead Rate: A Beginner’s Guide

As someone who has spent years working in accounting and financial management, I know how confusing overhead allocation can be for beginners. One of the most fundamental yet misunderstood concepts is the predetermined overhead rate (POHR). In this guide, I break down what it is, why it matters, and how businesses use it to allocate costs accurately.

What Is a Predetermined Overhead Rate?

The predetermined overhead rate is a tool businesses use to estimate manufacturing overhead costs before production begins. Instead of waiting until the end of an accounting period to assign overhead, companies use POHR to distribute these costs in real time. This helps in pricing decisions, budgeting, and financial reporting.

Why Use a Predetermined Rate?

Without POHR, businesses would have to wait until actual overhead costs are tallied, delaying financial statements and decision-making. By estimating overhead upfront, companies can:

  • Assign costs to products more efficiently.
  • Maintain consistent pricing strategies.
  • Avoid fluctuations in cost reporting.

How to Calculate the Predetermined Overhead Rate

The formula for POHR is straightforward:

\text{Predetermined Overhead Rate} = \frac{\text{Estimated Total Manufacturing Overhead Costs}}{\text{Estimated Total Units of Allocation Base}}

Choosing an Allocation Base

The allocation base links overhead costs to production. Common bases include:

  • Direct labor hours (for labor-intensive industries)
  • Machine hours (for automated production)
  • Direct labor costs (when wages are a significant expense)

Example Calculation

Suppose a furniture manufacturer estimates $500,000 in annual overhead costs and 50,000 machine hours. The POHR would be:

\text{POHR} = \frac{\$500,000}{50,000 \text{ hours}} = \$10 \text{ per machine hour}

If a table takes 5 machine hours to produce, the overhead cost allocated would be:

5 \text{ hours} \times \$10 = \$50

Advantages of Using POHR

  1. Consistency in Costing – By using a fixed rate, businesses avoid erratic cost assignments.
  2. Simplified Financial Reporting – Overhead allocation happens smoothly without waiting for actual costs.
  3. Better Budgeting – Managers can forecast expenses and set prices more accurately.

Potential Pitfalls

While POHR is useful, it has limitations:

  • Inaccurate Estimates – If actual overhead differs significantly from estimates, product costs may be distorted.
  • Overhead Volatility – Sudden cost increases (e.g., energy prices) can render the rate obsolete.
  • Misallocation Risks – Choosing the wrong allocation base leads to incorrect product costing.

Adjusting for Under- or Over-Applied Overhead

At year-end, companies compare actual overhead costs with allocated amounts. The difference is either:

  • Underapplied Overhead (Actual > Allocated)
  • Overapplied Overhead (Actual < Allocated)

This variance is adjusted in financial statements, often through cost of goods sold (COGS).

Real-World Application: A Manufacturing Case Study

Let’s examine a U.S.-based auto parts manufacturer:

Cost FactorEstimatedActual
Total Overhead Costs$1,200,000$1,300,000
Machine Hours60,00065,000

Calculations:

  1. POHR = \frac{\$1,200,000}{60,000} = \$20 \text{ per machine hour}
  2. Allocated Overhead = 65,000 hours × $20 = $1,300,000
  3. Actual Overhead = $1,300,000

Here, overhead was perfectly applied. But if actual overhead were $1,400,000, the underapplied amount ($100,000) would require adjustment.

Comparison: POHR vs. Actual Costing

AspectPredetermined Overhead RateActual Costing
TimingEstimated upfrontCalculated after production
AccuracyDepends on estimatesMore precise but delayed
Use CaseManufacturing, job costingSmall-scale operations

Conclusion

The predetermined overhead rate is a powerful tool for cost management, but it requires careful estimation and periodic review. By understanding its mechanics, businesses can improve financial planning and maintain accurate product costing. If you’re new to managerial accounting, mastering POHR is a crucial step toward financial proficiency.

Scroll to Top